© OpenStreetMap contributors
- Add External Layer
- Upload Shapefile
- Layer Tutorial
- Close
Use the checkbox () to show or hide a layer.
Use the radio buttons () to select a layer to use with the identify function.
- Layers
- Opacity
Available layers
Search for marine data across UK organisations
- API
- How-To
- About
- Contact MEDIN
- Share
Metadata: 2008, QinetiQ, Westermost Rough Offshore Wind Farm, Radar Pre-planning Assessment
Abstract:
This project is a pre-planning assessment of the potential impact of Westermost Rough offshore wind farm on radar in the vicinity of the proposed development. QinetiQ undertook the project in 2008 assuming the worst case, as agreed with Dong Energy, using the maximum number of turbines and the largest blade tip height. The assessment takes into consideration thirteen aerodromes or facilities inside the standard consultation distances as has been previously set out and/or where turbines are within airspace covered by an instrument flight procedure or in radar line of sight to a particular aerodrome facility. The project concluded there is potential for major clutter and false returns from a large number of turbines, in an area close to a North Sea oil rig helicopter route, within the Anglia Radar Unit area of responsibility, and under a military danger area resulting in the likelihood of a number of aviation objections despite no major material impact being likely. There are also likely to be vessel traffic services (VTS) concerns due to the Spurn radar, situated on the mouth of the River Humber, where a loss of detection of vessels travelling within the vicinity of the wind farm is likely to be experienced. Therefore it is likely that objections will be raised to the proposed Westermost Rough wind farm, and there may be difficulties in resolving some issues with the relevant facilities. The report recommends the Wind Farm Radar Impact Assessment Team hold discussions with DONG Energy to help inform decisions on the proposed way forward for the Westermost Rough wind farm development with respect to radar and aviation issues.
Data holder:
Thomas Walsh / Ferdinando Giammichele [DONG Wind (UK) Ltd.]
| Other details | ||
| Internal code | Internally assigned metadata identifier | 5139 |
| Title | The title is used to provide a brief and precise description of the dataset such as 'Date', 'Originating organisation/programme', 'Location' and 'Type of survey'. All acronyms and abbreviations should be reproduced in full. | 2008, QinetiQ, Westermost Rough Offshore Wind Farm, Radar Pre-planning Assessment |
| File Identifier | The File Identifier is a code, preferably a GUID, that is globally unique and remains with the same metadata record even if the record is edited or transferred between portals or tools. | 9f3f45081e69502788916ec6453c3bb2 |
| Resource Identifier | This is the code assigned by the data owner. | 4097 |
| Resource type | The resource type will likely be a dataset but could also be a series (collection of datasets with a common specification) or a service. | series |
| Start date | This describes the date the resource starts. This may only be the year if month and day are not known | 2008-12-01 |
| End date | This describes the date the resource ends. This may only be the year if month and day are not known | 2009-12-01 |
| Spatial resolution | This describes the spatial resolution of the dataset or the spatial limitations of the service. | inapplicable |
| Frequency of updates | This describes the frequency with which the resource is modified or updated i.e. a monitoring programme that samples once per year has a frequency that is described as 'annually'. | unknown |
| Abstract | The abstract provides a clear and brief statement of the content of the resource. | This project is a pre-planning assessment of the potential impact of Westermost Rough offshore wind farm on radar in the vicinity of the proposed development. QinetiQ undertook the project in 2008 assuming the worst case, as agreed with Dong Energy, using the maximum number of turbines and the largest blade tip height. The assessment takes into consideration thirteen aerodromes or facilities inside the standard consultation distances as has been previously set out and/or where turbines are within airspace covered by an instrument flight procedure or in radar line of sight to a particular aerodrome facility. The project concluded there is potential for major clutter and false returns from a large number of turbines, in an area close to a North Sea oil rig helicopter route, within the Anglia Radar Unit area of responsibility, and under a military danger area resulting in the likelihood of a number of aviation objections despite no major material impact being likely. There are also likely to be vessel traffic services (VTS) concerns due to the Spurn radar, situated on the mouth of the River Humber, where a loss of detection of vessels travelling within the vicinity of the wind farm is likely to be experienced. Therefore it is likely that objections will be raised to the proposed Westermost Rough wind farm, and there may be difficulties in resolving some issues with the relevant facilities. The report recommends the Wind Farm Radar Impact Assessment Team hold discussions with DONG Energy to help inform decisions on the proposed way forward for the Westermost Rough wind farm development with respect to radar and aviation issues. |
| Lineage | Lineage includes the background information, history of the sources of data, data quality statements and methods. | Created by The Crown Estate with th epurpose of upload it on the Marine Data Exchange |
| Additional information | This describes relevant references to the data e.g. reports, articles, websites plus other useful information not captured elsewhere. | Origin: Sonar Research and Development Ltd (SRD) |
| Related keywords | ||
| Keyword | General subject area(s) associated with the resource, uses multiple controlled vocabularies | Marine Environmental Data and Information Network |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Consenting | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Pre-Construction monitoring | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Socio-economic and Infrastructure | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Radar backscatter | |
| Geographical coverage | ||
| North | The northern-most limit of the data resource in decimal degrees | 53.843953431849 |
| East | The eastern-most limit of the data resource in decimal degrees | 0.21632170246254 |
| South | The southern-most limit of the data resource in decimal degrees | 53.767314211275 |
| West | The western-most limit of the data resource in decimal degrees | 0.086843046259463 |
| Responsible organisations | ||
| Role | The point of contact is person or organisation with responsibility for the creation and maintenance of the metadata for the resource. | pointOfContact |
| Organisation name | Thomas Walsh / Ferdinando Giammichele [DONG Wind (UK) Ltd.] | |
| Position name | Data Manager / GIS Manager | |
| Phone | 442078115252 | |
| Fax | 4420781152987 | |
| Delivery point | 33 Grosvenor Place, Belgravia | |
| Postal code | SW1X 7HY | |
| City | London | |
| XTHWA@dongenergy.co.uk / FERGI@dongenergy.co.uk | ||
| URL | www.dongenergy.com | |
| Role | The custodian is the person or organisation that accepts responsibility for the resource and ensures appropriate care and maintenance. If a dataset has been lodged with a Data Archive Centre for maintenance then this organisation is be entered here. | custodian |
| Organisation name | Thomas Walsh / Ferdinando Giammichele [DONG Wind (UK) Ltd.] | |
| Position name | Data Manager / GIS Manager | |
| Phone | 442078115252 | |
| Fax | 4420781152987 | |
| Delivery point | 33 Grosvenor Place, Belgravia | |
| Postal code | SW1X 7HY | |
| City | London | |
| XTHWA@dongenergy.co.uk / FERGI@dongenergy.co.uk | ||
| URL | www.dongenergy.com | |
| Role | The originator is the person or organisation who created, collected or produced the resource. | originator |
| Organisation name | Thomas Walsh / Ferdinando Giammichele [DONG Wind (UK) Ltd.] | |
| Position name | Data Manager / GIS Manager | |
| Phone | 442078115252 | |
| Fax | 4420781152987 | |
| Delivery point | 33 Grosvenor Place, Belgravia | |
| Postal code | SW1X 7HY | |
| City | London | |
| XTHWA@dongenergy.co.uk / FERGI@dongenergy.co.uk | ||
| URL | www.dongenergy.com | |
| Resource locators | ||
| Locator URL | Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk/details/2328/summary |
| Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk | |
| Dataset constraints | ||
| 21 Conditions for Access and Use - Use limitation | This states any constraints on use of the data. Multiple conditions can be recorded for different parts of the data resource. If no conditions apply, then `No condtions apply` is recorded. This uses free text. | no conditions apply |
| Available data formats | ||
| Data format | Format in which digital data can be provided for transfer | |
| Version info | ||
| Date of publication | The publication date of the resource or if previously unpublished the date that the resource was made publicly available via the MEDIN network. | 2008-12-01 |
| Date of creation | The date that the resource was created. | 2008-12-01 |
| Harvest date | The date which this record has been (re)harvested from the provider. | 2026-04-19 |
| Metadata date | The date when the content of this metadata record was last updated. | 2014-03-14 |
| Metadata standard name | The name of the metadata standard used to create this metadata | MEDIN Discovery Metadata Standard |
| Metadata standard version | The version of the MEDIN Discovery Metadata Standard used to create the metadata record | Version 2.3.7 |