Working together

To improve access to and stewardship of marine data

Browse Medin datasets

  • Found 1395
  • Show (1-100)
  • Prev
  • Next
Title
The Development of an Instrument Array to Measure the Concentration of Silt and Sand in the Overflow from Aggregate Dredgers
2005, HR Wallingford, Lynn and Inner Dowsing Offshore Wind Farms, Metocean Study
2012-2013, PMSL, Zone 3 Dogger Bank Teesside A and B Inshore Export Cable Corridor, Fish and Shellfish Surveys
2004, Osiris Projects, London Array Offshore Wind Farm, Geophysical Surveys
2015, EGS, Zone 6 Rampion, Geophysical Survey
2005, RBA Research Ltd, Lincs Offshore Wind Farm, Public Consultation
2002-2007, Gunfleet Sands Offshore Wind Farm, Meteorological Mast and Oceanographic Data
2008, Engineering Technology Applications Ltd. ETA, Skerries Tidal Site, Shore End Cable Landing Site Survey
2011 Marine Ecological Surveys (MES) Recovery os Seabed Resources Following Marine Aggregate Extraction
2013, Natural Power Consultants, Gunfleet Sands 3, Year 1 Post-Construction Export Cable Monitoring
2014, Zone 3 - Dogger Bank, IECS, Teesside Landfall Intertidal and Phase 1 Benthic Survey Report 2013
2006, LDA Design, Lincs Offshore Wind Farm, Seascape and Visual Assessment
2006, ABP Marine Environmental Research Ltd (ABPmer), Lincs Offshore Wind Farm, Coastal Processes: Technical Report
2012- 2014 Zone 9 Celtic Array, LIDAR Windcube data
2005, Rudall Blanchard Associates, Ormonde Offshore Wind Farm, PROTEUS Modelling
2002, English Heritage, Military Aircraft Crash Sites - Archaeological guidance on their significance and future management
2005-2007, ECON Ecological Consultancy, Race Bank, Boat-based Ornithological Surveys
2015, EGS, Lincs Offshore Wind Farm, LS16 Jack-Up Clearance Survey
2002, Caroline Weir, Gunfleet Sands Offshore Wind Farm, Marine Mammals
Assessment of the distribution and intensity of fishing activities in the vicinity of aggregate extraction sites
2011, Cathie Associates, Blyth NaREC Demonstration Site, Conceptual Engineering Assessment
Marine Aggregates: Science, Industry, Stewardship and People Networks_Explore the Sea Floor
2004, Project Management Support Services Ltd., (PMSS Ltd), Greater Gabbard Offshore Wind Farm, Environmental Impact Assessment, Scoping Reports
2012, Zone 9 Celtic Array, 6ALPHA, UXO Investigations
2010, ABP Marine Environmental Research, Improving sustainability indicators for marine aggregate dredging
2010 - 2013, Natural Power, Blyth NaREC Offshore Demonstration Site, Wind Resource Assessment
2011, CMACS Ltd., Ormonde Offshore Wind Farm, Boat-Based Bird Survey
2010 Zone 6 Rampion, Osiris Geophysical Survey
2004, Seacore, Barrow Offshore Wind Farm, Monitoring Specifications
2012, Environmental Resource Management, East Anglia ONE Offshore Wind Farm, Environmental Statement
Sheringham Shoal Offshore Wind Farm Environmental Statement- Appendix 15.5: Stage 2 Archaeological recording and sampling of vibrocores
2012-2013 Costa Head, Anatec, Navigation Risk Assessment
2009, GEMS, Humber Gateway Offshore Windfarm, Geotechnical Investigation at two possible met mast locations
2016, Bibby HydroMap, Humber Gateway Offshore Wind Farm, Geophysical Survey
2014-Present, DONG Energy Power (UK) Ltd., Westermost Rought Offshore Wind Farm, LiDAR Wind Data
2011, Cefas, Modelling possible Food-Web Effects of Aggregate Dredging in the Eastern English Channel
2011, RPS/Titan, Gunfleet Sands 3, Pre-Construction Sub-tidal Benthic Monitoring (including Geophysical Survey)
2008, Osiris Projects, Barrow Offshore Wind Farm, Post-Construction Cable Route Inspection and Scour Monitoring Survey
2013, dB Attenuation Ltd, Teesside Offshore Wind Farm, Post Construction Acoustic Survey
2003, National Wind Power Offshore Ltd., North Hoyle Offshore Wind Farm, Baseline Monitoring
2009, Subacoustech Environmental Ltd, Gunfleet Sands Offshore, Monitoring of underwater noise from impact piling operations at the Gunfleet Sands Offshore Wind Farm during herring spawning season
2007, Subacoustech, Greater Gabbard Offshore Wind Farm, Summary of subsea noise impact modelling in support of the Greater Gabbard Offshore Wind Farm development
2011, Highlands and Islands Airports Ltd, Argyll Array, Potential Effect of Argyll Array Offshore Wind Farm Proposal on Tiree Airport
2006, RSK Environmental Ltd, West of Duddon Offshore Wind Farm, Technical Report C: Seascape and Visual Impact Assessment
Walney Offshore Wind Farm Environmental Statement- Annex 4.1.1: Bathymetric and Geophysical Survey of Walney Offshore Wind Farm Site and Cable Route (WoDS relevant)
2006, Sonar Research and Development Ltd (SRD), Westermost Rough Offshore Wind Farm, Geophysical Survey
Teesside Offshore Wind FArm AGDS Data Analysis Report
2006, National Physical Laboratory, Lynn and Inner Dowsing Offshore Wind Farms, Underwater Noise Monitoring During Test Pile Installation
2016, Deep BV, Walney Offshore Wind Farm, Export Cable Geophysical Depth of Burial Survey
2013, MMT, Buchan Deep Hywind Offshore Wind Farm, Geophysical Survey
2013-2015, TEL Ltd., St David's Head, Ornithology Surveys
2013, ESG, Burbo Bank Extension Offshore Wind Farm, Intertidal Geophysical Survey
2013, Liverpool_Bangor University, Zone 9 Celtic Array, Landsystem Model
2010-2012, EMEC, Scapa Flow, TRIAXYS Wave Data Series
2002, GeoData Institute, Kentish Flats Offshore Wind Farm, A Socio-Economic Study of the Proposed Kentish Flats Offshore Wind Farm Development
2009-2010, Brown and May Marine Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Year 1 Post-Construction Potting Survey
2012-2013, MMT, Westermost Rough, Geophysical Survey and Anomaly Inspection
2011, Entec UK Limited, Teesside Offshore Windfarm, FEPA Monitoring - Electromagnetic Field Study
2008, Lankelma, Lynn and Inner Dowsing, Skegness Beach Static Cone Penetration Tests
2014, Fugro Alluvial Offshore Limited, Burbo Bank Extension Offshore Wind Farm, Geotechnical Site Investigation (Array Cables and Export Cable Route)
2012, Centre for Marine and Coastal Studies Ltd. (CMACS), West of Duddon Sands Offshore Wind Farm, Pre-Construction Benthic Baseline Survey
2004 - 2005, Royal Haskoning UK Ltd, Thanet Offshore Wind Farm, Aerial and Boat Based Bird Surveys
2013 Geosurv, Kyle Rhea, Sub-bottom Data Overview
2013 Zone 3 Dogger Bank Tranche C, Fugro EMU Benthic Ecology Characterisation Survey
2012, Orca Marine, Brough Head Wave Farm, Marine Cultural Heritage Baseline Assessment
2009, Centrica Energy, Race Bank Offshore Wind Farm, Population Viability Analysis of the North Norfolk Sandwich tern (Sterna sandvicensis) Population
Walney Offshore Wind Farm Environmental Statement- Annex 6.2.5: Navigation Risk Assessment
2010, Cathie Associates, Kyle Rhea, Geotechnical Desk Study
2008, Centre for Marine and Coastal Studies Ltd., (CMACS), Burbo Bank Offshore Wind Farm, Construction Phase Environmental Monitoring
2017, Spectrum Geosurvey, Westermost Rough Offshore Wind Farm, Consent Survey Q2 2017
2008, VandS Marine Contracting, Gunfleet Sands 1 Offshore Wind Farm, Offshore Hydrographical And Geophysical Cable Route Survey
2005, NPower, North Hoyle Offshore Wind Farm, Annual FEPA Monitoring Report
2010, SMRU Ltd., SeaGen Strangford Lough, SeaGen Noise Biological Assessment
2007, RPS Group Ltd, Lynn & Inner Dowsing Offshore Wind Farm, Boat-based Ornithological Monitoring Report
2016, HR Wallingford, Zone 6 Rampion, Underwater Noise Modelling
2010, Cefas, Integrated Inshore and Offshore Fishing activities data layer in aggregate producing Regional Environmental Characterisation (REC) areas
2004-2005, Lincs Offshore Wind Farm, Aerial Surveys of Waterbirds in Strategic Wind Farm Areas
2002-2012, RWE npower renewables, Skerries Tidal Site, Metocean Wave Rider Data at Rhyl Flats
2011, Envision, Isle of Lewis Wave Array,Benthic Survey
2015, GoBe Consultants, Gunfleet Sands 1 and 2, Post-Construction Year 3 - Marine Licence Environmental Monitoring Report
Sheringham Shoal Offshore Wind Farm Environmental Statement- Appendix 9.1: Epifaunal Assessment
2003-2006, Subacoustech Ltd. Burbo Bank Offshore Wind Farm, Underwater Noise and Vibration Assessment
2009, Centre for Marine and Coastal Studies Ltd., (CMACS), Burbo Bank Offshore Wind Farm, Post-Construction Year 2 Environmental Monitoring
2001, NRC, A Process for Setting, Managing and Monitoring Environmental Windows for Dredging Projects
2010-2011, Fugro EMU, Zone 6 RAMPION, Metocean Survey
2011-2012, Gardline Environmental, Zone 3 Dogger Bank Tranche A Nearshore Cable Corridor, Benthic Survey
2007, HR Wallingford, Development of the Marine Aggregate Extraction Risk Assessment framework (MARA) GIS
2007, COWRIE, Potential use of population viability analysis to assess the impact of offshore windfarms on bird populations
2012 Zone 9 Celtic Array, ABPmer Rhiannon Stage 1 Cable Landfall
2006-2010, SMRU Ltd., SeaGen Strangford Lough, Monitoring of Harbour Porpoise in Strangford Lough with focus on the Narrows
2007, Fugro, Lynn and Inner Dowsing, Pre-construction Side-scan Sonar Debris Clearance Survey
2013, CMACS, Ormonde Offshore Wind Farm, Benthic Environmental Survey
2012, IECS, Zone 3 Dogger Bank Teesside Landfall, Intertidal and Phase 1 Biotope Survey
2004, ECON, Scroby Sands Offshore Wind Farm, Ornithological Monitoring: Assessing the potential impact of the proposed wind farm upon Little tern Sterna albifrons: the construction phase 2004
2007, RPS Energy, Lynn & Inner Dowsing Offshore Wind Farm, Environmental Report For Monitoring of the Disposal of Drill Arisings
2010, Galloway Fisheries Trust, Robin Rigg, Post-construction Migratory Fish Survey
2010, COWRIE, A Further Review of Sediment Monitoring Data
2015, EGS, Lincs Offshore Wind Farm, Post Construction Hydrographic, Geophysical and Benthic Survey
2012, PLA Hydrographic Service, Gunfleet Sands 1 and 2, Wind Turbine Inspection Surveys (Autumn 2012)
2001, Hydroseach Associates Ltd, Gunfleet Sands Offshore Wind Farm, Landfall Site Investigation