<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2021-2023, HiDEF, Outer Dowsing, Array Area, Seabird and Marine Megafauna</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=010_88b02693-62fe-467a-a18f-ec27646a2ba9</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">In March 2021, GoBe Consultants commissioned HiDef Aerial Surveying Limited (&#x2018;HiDef&#x2019;) to undertake 
 a programme of high-resolution digital video aerial surveys for marine megafauna, ornithological and 
 human activity over the proposed Green Investment Group (GIG) and TotalEnergies Outer Dowsing
 offshore wind development site (&#x2018;Outer Dowsing&#x2019;). The Outer Dowsing project is a proposed offshore 
 wind farm, located approximately 54km from the Lincolnshire coast.
 Monthly surveys were flown from March 2021 to February 2022 and September 2022 to August 2023, 
 with bi-monthly surveys flown between March and September 2022, providing 37 surveys in total. HiDef 
 designed a survey that placed transects 1.5km apart across the originally proposed Outer Dowsing
 development area plus a 4km surrounding buffer (&#x2018;the survey area&#x2019;). The total survey area was 
 approximately 926km2
 .</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20240226</dc:date>
</oai_dc:dc>
