<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2011, Marico Marine, Blyth NaREC Offshore Demonstration Site, Navigation Assessment and Navigational Risk Assessment</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_0021a671-0af4-4cc8-bb79-ef5274f43378</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Marine and Risk Consultants Ltd (Marico Marine) was commissioned by National Renewable Energy Centre (client) and Natural Power Consultants (consultant) to conduct a Navigation Assessment and Navigational Risk Assessment for the proposed development of a series of offshore demonstration turbine arrays near Blyth, Northumberland. To include consideration of potential impacts and hazards of the demonstration project on navigation. he key objectives of this study are to assess the navigational impacts of the demonstration project in the vicinity of Blyth, Northumberland after undertaking consultation, hazard identification and scoring meetings, with additional analysis in order to present the maximum amount of information relative to the future installation.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">201204</dc:date>
</oai_dc:dc>
