<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2013, Osiris Projects and CMACS, Lincs, Geophysical and Benthic Surveys (Summer)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_02a42195-9d8f-4411-a9bc-df1c9157cd33</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Osiris Projects were commissioned in October 2013 by Centrica Renewable Energy
Ltd. (CREL) to carry out post-construction surveys on the LINCS Offshore Wind Farm
(OWF) and associated export cable route. There were six key elements of the surveys:
? LINCS OWF repeat pre-construction benthic baseline survey
? LINCS OWF drill arising mounds benthic survey
? LINCS OWF export cables
? LINCS OWF site post-construction survey focussing on the Inter Array Cables
(IAC)
? LINCS OWF site post-construction survey focussing on the No Cable Zones
(NCZ)
? LINCS OWF site scour surveys at turbines LS61 &#x2013; LS63. The aims of the surveys were to:
? To repeat the pre-construction benthic baseline survey (2010) in order to satisfy
Marine Licence Annex 1.
? To sample four of the sixteen drill arising mounds present on the site.
? To ground truth any distinct seabed features consistent with Sabellaria reef
formations, identified via SSS within the No Cable Zones (NCZ).
? To undertake a 100% coverage swath bathymetric survey around a sample of
three adjacent turbines, 61, 62 and 63.
? To assess the extent if any changes to bed form morphology along the interarray
cable routes.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:47:16</dc:date>
</oai_dc:dc>
