<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2008, Osiris Projects, Robin Rigg Offshore Wind Farm, Mid-construction Geophysical Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_0b1eb537-2ef6-488f-9767-f2df3b2c6606</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">On the instructions of E.ON Climate &amp; Renewables UK, Osiris Projects were commissioned to undertake a pre-construction geophysical and scour monitoring survey covering the proposed Robin Rigg Offshore Wind Farm development site. The survey was undertaken during the period 26th March to 27th April 2008. High-resolution side scan sonar, swath multi-beam and single beam bathymetry and magnetometer data were acquired along all survey lines, which were run at 100m centres, with cross lines at 200m centres, in order to accurately map the seabed within the wind farm development area. The primary objectives of the survey were to map bathymetry and seabed features, including the presence of any magnetic anomalies within the wind farm area.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T14:03:57</dc:date>
</oai_dc:dc>
