<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2013, Gardline, Galloper, Phase 2 Geophysical Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_0b21f66f-cf43-4e17-bfab-3e41c742a402</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Gardline Geosurvey Ltd was contracted to undertake survey operations within the proposed Galloper Offshore Wind Farm area, commencing on 23-Apr-2013, in support of Gardline Geosciences Ltd. Gardline Geosciences Ltd was contracted to undertake Geotechnical Boreholes and Cone Penetrometer Tests (CPTs) planned on the proposed Galloper Offshore Wind Farm area. These tests were to assist planning and design over 48 Wind Turbine Generator (WTG) locations and one Offshore Site Platform (OSP) location. Reporting for the project has been sub-divided into four volumes.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20250304T09:49:00</dc:date>
</oai_dc:dc>
