<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2008, Osiris Projects, Walney Offshore Wind Farm, Hydrographic and Geophysical Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_0c6eb2b2-0f73-4236-bf9b-3ce82a52fad1</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">On the instructions of RPS Environmental Consultancy acting under the instructions of
DONG Energy, Osiris Projects were commissioned to carry out a hydrographic and
geophysical survey covering the proposed Walney offshore wind farm site, 9 miles
west of Walney Island, Cumbria. The aims of the survey were to provide a
comprehensive overview of seabed levels and sub bottom sediments throughout the
site.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">200808</dc:date>
</oai_dc:dc>
