<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, Fugro Seacore, Beatrice, Near Shore Geotechnical Site Investigation</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_0df39ab5-af1a-46e4-9e2a-2a6431486fed</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Fugro Seacore Limited was contracted to BOWL to carry out a ground investigation at the Beatrice
Offshore Wind Farm site. The investigation was carried out along the proposed export cable route
to identify the geotechnical conditions at the site and to provide information that would assist the
Client in the design of the proposed cable installation works.
The site works were performed from the jack-up drilling platform Aran 120A from 13 February 2015
to 9 April 2015 in accordance with instructions received from BOWL.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20150421</dc:date>
</oai_dc:dc>
