<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014, EGS, Lincs, Turbine LS28 Clearance Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_0fb836b8-d4f9-4662-9380-b4c1438bf7fd</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">After completion of the depth of burial survey of the Lincs Array Cables project, and the Export Cable
survey, EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and
Multibeam (MBES) clearance survey of the no cable zones (500m by 500m) around WTGs LS28 (on the
Lincs site) and ID24 (on the Inner Dowsing Site). The areas surveyed were identified by Centrica for
the upcoming works on the aforementioned turbines and the need to get a jack up vessel in the locality
to complete the works. This report details the operations and results of the survey around LS28.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:47:08</dc:date>
</oai_dc:dc>
