<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, Osiris Projects, Teesside, Geophysical Survey (Spring)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_11434c88-73a5-4cae-a34c-488c4ed1dd66</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, owned and operated by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in order to monitor the seabed state, specifically the identification of seabed debris and scour or sediment accretion within the wind farm area.
The survey was completed under LOGIC Terms and Conditions. The survey works were conducted by MV Lia and were undertaken between 25th February and 20th March 2015.
The aims of the survey were:
? To identify debris within the construction area;
? To identify any changes to seabed morphology, to enable the evaluation of the effectiveness
of installed scour protection and ratify the predictions for scour development;
? Inform the foundation and cable maintenance schedule;
? To satisfy the requirements of the Marine Licence, specifically the monitoring of
Archaeological Exclusion Zones.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20211110T16:47:22</dc:date>
</oai_dc:dc>
