<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, Spectrum Geosurvey, Westermost Rough, Consent Survey Q2 2015</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_11b14dc9-3421-44b7-9674-56aabe0a1040</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Spectrum Geosurvey Limited was contracted to perform sidescan sonar and multibeam bathymetry surveys on the Westermost Rough offshore wind farm (WMR01). The purpose of the survey programme was to serve as the first of six consent surveys in the operation and maintenance phase of the wind farm&#x2019;s FEPA licence agreement.

The survey scope consisted of surveys along the export cable, around the offshore substation, around six turbines and along the array cables bounding the south, west and north sides of the main site.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T14:14:40</dc:date>
</oai_dc:dc>
