<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012, Zone 9 Celtic Array, Stage 1 Preliminary Environmental Information In Support of Section 42 of the Planning Act 2008</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_2123104b6132401dbf40593ad78dc176</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Celtic Array Limited (Celtic Array) is a joint venture between Centrica Renewable Energy Limited (CREL) and DONG Energy Wind Power Holdings A/S (DONG Energy). Celtic Array is proposing to develop an offshore wind farm, called Rhiannon Wind Farm (RWF), in the Irish Sea together with associated offshore infrastructure to bring electricity to shore on the Isle of Anglesey, Wales. Celtic Array is proposing to develop RWF through a subsidiary company Rhiannon Wind Farm Limited. This Stage 1 PEI provides the information described in Part 1 of Schedule 2 of The Regulations where it is proposed to apply for a DCO under the Planning Act 2008. This report is one of a suite of documents which will be published by Celtic Array as it prepares for the submission of applications for consents for RWF. It contains non-statutory project and environmental information on the marine export cables from the outer boundary of the Welsh territorial seas as far as mean high water, and Onshore infrastructure above mean low water springs. Associated Document :SE-D-EV-071-0117-000000-001</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">201410 20090501</dc:date>
</oai_dc:dc>
