<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012, Royal Haskoning, Zone 3 Dogger Bank Teesside A and B, Coastal Cable Corridor Assessment</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_2570b950-7127-4fca-a0a4-d667e022fde6</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Forewind Limited (Forewind) plans to connect up to 4GW of projects from the Dogger Bank Zone to the Teesside region (referred to as Dogger Bank Lackenby). Forewind has commissioned Royal Haskoning to undertake a study to identify environmentalconstraints to the selection of cable routes and the installation of cables for Dogger Bank Lackenby.

This report presents the findings of the coastal investigation and serves to identify and evaluate the environmental constraints (biological, human and physical) that could affect landfall within the defined cable route study area. The coastal study area is defined by the distance between mean high water springs (MHWS) out to approximately 20km from shore.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20220315T12:55:48</dc:date>
</oai_dc:dc>
