  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012, EGS, Burbo Bank Offshore Wind Farm, Post-Construction Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_27e99e41-0666-4c9f-82ac-a0bd1e2cae3d</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">DONG Energy contracted EGS (International) Ltd to undertake a bathymetric survey in the
post-construction (operational) phase of the project using both Multibeam Echo Sounder
(MBES) and Side Scan Sonar (SSS) survey techniques. The primary objective of the survey
was to assess the stability of the scour protection around the turbine foundations.
To meet the requirements of the survey, survey lines were run at a distance of 25 metres
either side of a centreline which connected the turbine locations.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">201211</dc:date>