  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014, Boskalis Offshore, West of Duddon Sands, Provision of Rock Installation Services</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_29a30502-a1f0-4726-89b1-02253b276cfe</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">DONG Energy West of Duddon Sands (UK) Ltd., and ScottishPower Renewables (WoDS) Ltd. awarded the Rock Installation contract for West of Duddon Sands &#x2013; cable crossings Project to Boskalis Offshore. The report in this series, Project Installation Procedures (PIP), has been prepared to provide information regarding the following aspects of the project:
&#x2022; Scope of work;
&#x2022; Working methods;
&#x2022; Materials to be used;
&#x2022; Quality control procedures;
&#x2022; Planning;
&#x2022; Deliverables 

At four crossing locations the exposed cable will be covered with rock. A filter layer has been installed prior to the final armour layer. A separation layer has been installed prior to the cable lay.</dc:description>