<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014, Osiris Projects, Teesside, Operations and Maintenance Geophysical Survey (AugSept)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_2c4c7fe8-d395-4ac5-b9f5-ecb5d2e43848</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Operations and maintenance geophysical survey for Teesside Offshore Wind Farm between 19 August and 3 September 2014. The aims of the survey were to; to identify debris within the construction area; to identify changes to seabed morphology; to enable the evaluation of the effectiveness of installed scour protection and ratify the predictions for scour development; to Inform the foundation and cable maintenance schedule; and to satisfy the requirements of the Marine License, specifically the monitoring of Archaeological Exclusion Zones.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20211110T16:52:53</dc:date>
</oai_dc:dc>
