<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2008-2010, Walney Offshore Wind Farm, Pre-construction Monitoring</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_2deb5a7d-c966-4eea-8f24-02e347b071a5</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Walney Offshore Windfarm (WOW) is located in the East Irish Sea and has been con-structed in two stages, Walney 1 and Walney 2. Export cable 1 runs into Morecambe Bay and connects to a transformer station at Heysham. Export cable 2 comes ashore at Cleveleys and connects to a transformer station at Hillhouse, Stanah. The construction of Walney Offshore Windfarms will commence in February 2010. Pre-construction surveys were conducted from 2008 and ongoing into 2010.
The document within this series describes the environmental monitoring undertaken pre construction of Walney 1 and 2 and export cable routes 1 and 2. The environmental monitoring reported in this document should be seen as an ongoing process of monitoring pre-, during and post construction monitoring. Monitoring activities will be reported annually to the licensing authority, as described in the Marine Licence, for a period up to three years post-construction. The technical reports from the monitoring surveys are also provided within this series.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20120501</dc:date>
</oai_dc:dc>
