<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012, Osiris Projects, Robin Rigg Offshore Wind Farm, Post-Construction Geophysical Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_2f4dd2e2-e8af-4685-8689-23ed3deb548c</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Osiris Projects were commissioned in January 2012 by E.ON Climate and Renewables
to carry out bathymetric and side scan sonar surveys at the Robin Rigg offshore wind
farm. The survey was completed under E.ON Terms and Conditions and was carried
out between 16th January and 26th March 2012. The survey covered the main turbine area and the export cable corridor.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">201210</dc:date>
</oai_dc:dc>
