<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2003, Ministry of Agriculture, Fisheries and Food (MAFF), Inner Dowsing, Food and Environment Protection Act (FEPA) Licence</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_2fa9b3f4-5081-4ee4-b088-fd95133e9550</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">The study was carried out in October 2003 to establish and regulate the conditions for constructing the Inner Dowsing offshore wind farm near Skegness, Lincolnshire, under Licence No 31814/03/0. Its purpose was to detail engineering, environmental, and procedural requirements for installing 30 wind turbines, focusing on safeguarding environmental and archaeological resources. The methodology included a combination of detailed engineering designs, extensive regulatory review, stakeholder consultation, specified construction techniques, and comprehensive environmental monitoring through pre-, during, and post-construction surveys and reporting. The conclusions stress the necessity for rigorous compliance with licence conditions, thorough environmental management, and transparent communication with authorities and stakeholders. Key recommendations include strict adherence to all procedures, documented mitigation measures, maintenance of clear reporting lines, adaptive monitoring practices, and continued stakeholder engagement to ensure legal, environmental, and operational integrity throughout the project&#x2019;s lifecycle.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:44:05 20031013T00:00:00</dc:date>
</oai_dc:dc>
