<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014 Zone 3 Dogger Bank Teeside A and B, Forewind, Environmental Statement</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_319afb92-225e-4664-b0b6-f11f09e6005d</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Dogger Bank Teesside A &amp; B, the subject of this ES, are the first and second
projects of the second stage of the Dogger Bank development. Forewind&#x2019;s
development of the Dogger Bank Zone began with Dogger Bank Creyke Beck
for which planning application was lodged during 2013. Dogger Bank Teesside
A &amp; B will comprise two wind farms, each generating up to 1.2GW, and will
connect to the existing National Grid substation at Lackenby, in Teesside.
Dogger Bank Teesside A &amp; B projects will have a total combined generating
capacity of up to 2.4GW.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20140301</dc:date>
</oai_dc:dc>
