  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">In May 2012 EGS (International) Ltd was contracted to undertake a bathymetric survey in the post-construction (operational) phase of the project to determine whether there are any changes to seabed morphology at the wind farm site including inter array cables. The survey covered all turbine foundations using a corridor 370 metre wide along the array cables connecting the turbines.

To meet this objective EGS conducted a multibeam high frequency bathymetric survey combined with seabed mapping and sub-surface hazard identification using side-scan sonar (SSS) in conjunction with a USBL system, across each of the constructed WTG and substation location over the Barrow Offshore Windfarm. Survey operations over the site were completed with the EGS Pioneer on a 24 hour operational basis between 17th and 18th May 2012.</dc:description>