<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2011, LUC, Neart na Gaoithe Offshore Wind Farm, Onshore Phase 1 Habitat Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_371d7e6f-2ea5-460e-9656-5c75c620a17c</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Mainstream Renewable Power Limited is currently developing the Neart na Gaoithe Offshore Wind Farm, located 15.5 km off Fife Ness on the east coast of Scotland. An Environmental Statement had to be prepared in support of the application for planning permission to construct and operate grid connection infrastructure associated with the Neart na Gaoithe Offshore Wind Farm located within East Lothian. Land Use Consultants Limited (LUC) were commissioned by Mainstream Renewable Power Limited, on behalf of Neart na Gaoithe Offshore Wind Limited, to undertake a Phase 1 Habitat Survey as part of the Environmental Statement. The survey of the entire study area was undertaken following the Joint Nature Conservation Committee methodology (JNCC, 2010).</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">2011</dc:date>
</oai_dc:dc>
