<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2009, Osiris Projects, Barrow Offshore Wind Farm, Post-Construction Cable Route Inspection and Scour Monitoring Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_3d74763abae842b6b583ca0d23d2217f</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">On the instructions of Barrow Offshore Wind Limited, Osiris Projects were
commissioned to undertake an inspection survey covering the Barrow Offshore Wind
Farm export cable route, in conjunction with scour monitoring surveys at all of the
individual turbine locations within the main development area. Data acquisition took
place using the survey vessel MV &#x2018;So Fyne&#x2019;, during the period 31st March to 3rd April
2009.
High-resolution side scan sonar, swath multi-beam and single beam bathymetry data
were acquired along a number of parallel survey lines, which were generally run at 25m
centres, in order to accurately map the seabed along the cable route.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">200907</dc:date>
</oai_dc:dc>
