<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2013, Fugro EMU Ltd., Sheringham Shoal Offshore Wind Farm, Marine Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_3eeccfce-bff0-3682-8944-ba192dd62802</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Fugro EMU Limited (Fugro EMU) was commissioned by Scira Offshore Energy Limited to conduct a
bathymetry and sidescan sonar survey of the Sheringham Shoal Offshore Wind Farm, a prescribed
transit route and cable export corridor. The survey was required to fulfil Marine Management
Organisation (MMO) requirements for post-construction monitoring of scour, trenched cables and
debris.
In order to meet these requirements, the scope of work required that Fugro EMU provide the following
deliverables and reports:
? Accurate bathymetry across the Wind Farm and along the export corridors
? High resolution sidescan sonar across the entire survey area
? An archaeological assessment by subcontractor, Wessex Archaeology
The survey was undertaken between 1st November 2013 and 3rd December 2013 on board RV
Discovery, all survey objectives and contractual requirements were achieved.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20140305</dc:date>
</oai_dc:dc>
