<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2011, EMU, Wave Hub Test Centre, Noise Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_462de1cb-4197-441f-b348-92f8207bd17d</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">This report has been prepared by Subacoustech Environmental Ltd for EMU Limited. It describes the baseline
conditions found at the site for the installation of a wave energy facility, approximately 15 km off the north
coast of Cornwall. A number of background underwater noise measurements were taken at five locations for a
minimum duration of 15 minutes and repeated after a delay of over 1 hour.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20120104</dc:date>
</oai_dc:dc>
