<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, EGS, Blyth Demonstration Site, Annex I Site Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_49d73566-c01f-45d1-ad8d-63830c44a679</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">In June 2015, EDF Energy Renewables (EDF) contracted EGS International Ltd (EGSi), supported by Benthic Solutions Limited (BSL) to undertake a pre-construction geophysical, bathymetric and Annex I habitat survey within the Blyth Offshore Demonstrator Site. The objective of the benthic survey was to provide sufficient information to identify any features of conservation importance, such as Annex I habitats, that may have an impact on the installation and/or consenting process within the Array 2 area and Export Cable Route area. This series contains the Habitat Assessment Reports.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:29:54</dc:date>
</oai_dc:dc>
