<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2019, EGS, Burbo Bank Extension, Bathymetric Debris Clearance Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_512e2260-ebd3-445d-83ac-ed24f8ecd2c7</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">&#xD8;rsted Power contracted EGS international Ltd (EGSi) to undertake a bathymetric debris clearance survey at Burbo Bank Extension Wind Farm (BBW02) &#x2013; WTG J01 &#x2013; in the Irish Sea. Data was acquired on 25th August 2019. The purpose of this survey was to identify any seabed scour at the turbine location and detail the interpreted measurements laterally and vertically. The report in this series is the interpretation report for the J01 turbine. Operations were undertaken using a hull mounted dual head Kongsberg 2040C. The surveys were conducted onboard the EGS owned coastal survey vessel &#x2018;The Watchful&#x2019;, which operated on a 12hr basis from Liverpool marina. Vessel mobilisation, calibrations and verifications began between 22nd and 23rd August 2019 whilst the vessel was in Liverpool and were then completed offshore 24th August. All survey operations were completed on 25th August 2019.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20250310T19:22:21 20150508T00:00:00</dc:date>
</oai_dc:dc>
