<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014, EGS, Walney, Seabed Monitoring Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_5aa195d0-c795-42f6-90bd-4c8db6b8bd97</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">EGS International Ltd (EGSi) were contracted to undertake a post-construction survey of a
number of selected turbines, one substation and several array cables within WOW 1 &amp;amp; 2.
The aim of the survey was to assess the extent of any changes to seabed and scouring
around the turbine monopiles and the substation compared to the previous surveys within
the windfarm and also to identify any exposures along several array cables.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T14:09:51</dc:date>
</oai_dc:dc>
