<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2017, Bibby HydroMap, Teesside, Geophysical Surveys</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_62d210c0-11e5-4c86-9c0b-ee24fccc6245</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Bibby HydroMap were commissioned by EDF Energy Renewables, in July 2017, to undertake a 350m x 350m debris survey around turbine 14B on the Teesside Offshore Wind Farm (OWF), prior to the emplacement of a jack-up rig on the site. Once mobilised, the client also requested a further survey of the remainder of the wind farm site. The location of the windfarm is presented in Figure 1, below and the relevant turbine identified. The survey was completed under Bibby HydroMap&#x2019;s Terms and Conditions and was carried out between 24/07/2017 and 30/07/2017. The main objective of the surveys was to identify any object or conditions, which may constrain the emplacement of the jack-up rig.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20211110T16:50:04 20160607T00:00:00</dc:date>
</oai_dc:dc>
