<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2009, Centrica Renewable Energy Ltd., Post-Construction Monitoring</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_6931af9f-04a6-417f-9bd5-442343f90177</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Centrica Renewable Energy Ltd (CREL) commenced construction in 2007 of the Lynn and Inner
Dowsing (LID) offshore wind farms located 5 km to 8.5 km off the Lincolnshire coast. The project
consists of 27 turbines at Lynn and 27 turbines at Inner Dowsing

This document provides a summary of the post-construction monitoring undertaken at LID during
2009, as required by the latest versions of the LID FEPA Consents 31792/09/0 and 31814/10/0.
The FEPA licences are provided in Appendix 1.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">2009</dc:date>
</oai_dc:dc>
