<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2016, Deep BV Hydrography and Geophysics, West of Duddon Sands OFTO, Post-Construction Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_71786e84-73d7-4d4d-83fb-5cec411eb2fb</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">DONG Energy awarded Deep BV with the contract for the execution of the autumn 2016 Post-construction survey at West of Duddon Sands (WDS01) Offshore Wind Farm (OWF). The survey areas are located in the East Irish Sea with landfalls on the west coast of England. Survey 1, Consent: This consent survey covers a selection of 6 wind turbine generators (WTGs), 17 km of array cables between the selected WTG&#x2019;s, the WDS01 substation, as well as the entire export cable routes. Survey 2, Crossing and Proximity Agreement (CPA): This survey covers two cable crossing agreements (A10 &amp; A11) and one proximity agreement (A12).</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20240902T16:15:40</dc:date>
</oai_dc:dc>
