  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, Harkand Andrews Survey, Humber Gateway, Geophysical Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_768b016e-0945-433f-9cbc-e67d6c588922</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Post construction survey 2015 for Humber Gateway Offshore Wind Farm conducted by Harkand Andrews Survey between 17 March - 28 May 2015.
The extent of the areas covered by the post construction site survey are as follows:
- Array Cables: the array cables were surveyed in 15m wide corridors, using the array cable as the centre line.
- Export Cable Route: each export cable was surveyed in 15m wide corridors, using the export cable as the centre line.
- Turbine and offshore substation foundations: The turbine foundations and substation foundation were surveyed for 100m around the outside circumference of the turbine base.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:43:48</dc:date>