<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2016, Bibby HydroMap, Teesside, Operations and Maintenance Geophysical Surveys</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_7ba078f4-ad10-464d-8d28-7592862a1b33</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Bibby HydroMap were commissioned in September 2016 by EDF Energy Renewables to carry out geophysical and high resolution surveys of Teesside Offshore Wind Farm (OWF) as part of ongoing monitoring of the site. The survey was completed under Bibby HydroMap&#x2019;s Terms and Conditions. The survey was carried out between 07/09/2016 and 12/09/2016.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20211110T16:44:53</dc:date>
</oai_dc:dc>
