  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2007, Fugro Survey Ltd., Lynn and Inner Dowsing, Monopile Foundations Bathymetric Investigations</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_7c64a4f1-e8e3-42ab-9554-7bc7eb3368eb</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">The report within this series contains the operation details and results of the Lynn and Inner Dowsing Windfarm Mono Pile Foundation Bathymetric Investigation carried out for MT H&#xF8;jgaard A/S. The fieldwork was undertaken betweenthe 8th and the 26th January 2007 by Fugro Survey Limited, using the M/V Genesis.

The objective of the survey was to acquire, process and document high quality acoustic data, using a multibeam echosounder, to ascertain the bathymetry information about the mono pile locations. The survey work was performed for 30 mono pile locations on the Lynn Windfarm and 30 mono pile locations on the Inner Dowsing Windfarm. The survey vessel M/V Genesis was mobilised in Great Yarmouth with the necessary equipment and personnel to complete the project requirements and then operated out of Grimsby for the fieldwork.

The purpose of the survey is to collect information on the bathymetry conditions around each of the proposed mono piles. The information to be collected will include tidal levels and water depths</dc:description>