<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, Fugro, Barrow, Bathymetric Surveys</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_89660377-f622-473a-8179-b93f32d105e2</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Fugro EMU Limited (Fugro EMU) was commissioned by Dong Energy (the Client) to undertake an asset inspection survey of Barrow Offshore Windfarm (BOW01) array and inter-array cables. The survey area was situated in Morecambe Bay, approximately 25 km west of Heysham. The survey utilised two Fugro owned vessels, Fugro Seeker and Valkyrie and was undertaken between 31 August 2015 and 27 October 2015.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:27:52</dc:date>
</oai_dc:dc>
