<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2006, Osiris Projects, Barrow Offshore Wind Farm, Suspended Sediment Monitoring (FEPA Monitoring)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_8a8702d671a15c5b9124c4d9e15d17f8</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">This report examines the turbidity (suspended sediment) monitoring services during mono-pile installation at the Barrow offshore wind farm site, specifically during drilling operations. This was monitored to provide DEFRA with information to assist in assessing the environmental impact of this aspect on the construction process.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20050101 20050101</dc:date>
</oai_dc:dc>
