<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2016, Insight Marine Projects, Wave Hub (Hayle), Cable Tail Installation As-Built Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_8efb7ba4-1a6d-46dd-9b42-0a13c8560af6</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Insight Marine Projects Ltd were contracted to supply construction support services to James Fisher Marine Services Ltd during the cable tail extensions project at the WaveHub wave energy test site, Cornwall, UK. Installation of the cable extensions was undertaken onboard OSCV &#x2018;Aker Wayfarer&#x2019;. An &#x2018;As-Built&#x2019; visual (ROV) and multibeam (MBES) survey was conducted immediately after the installation work to verify the position of the cables as well as cable stabilisation and freespan rectification measures.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20241203T16:31:29</dc:date>
</oai_dc:dc>
