  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014, Natural Research Projects, Skerries, Seabird Pilot Study</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_8f39ab29-6ed6-4852-9e52-eed7dc15c26c</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">SeaGeneration Wales (SGW), a wholly owned subsidiary of Marine Current Turbines, is required to undertake pre-installation monitoring of seabirds in the vicinity of the Skerries Tidal Stream Array (the Project) off Anglesey. This 10MW tidal stream project received consent in 2012 but installation work has not yet commenced.

A requirement of the Marine Licence is that undertake appropriate pre-installation monitoring. The wider programme of monitoring work is considered in detail in the project&#x2019;s environmental monitoring and adaptive management plan (EMAMP) (MCT, 2014). The ornithological aspects of the EMAMP are set out in detail in the Seabird Monitoring Plan (SBMP) contained therein and this describes the seabird monitoring required to meet the Marine Licence consent conditions, this includes the undertaking of pre-installation seabird monitoring. It was agreed by the Skerries Science Group in February 2014 that the initial phase of the pre-installation monitoring would be to undertake a 4-month vantage point pilot survey to trial survey methods for pre-installation bird surveys to understand if the VP methodology can acquire appropriate data.</dc:description>