<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014, EGS, London Array OFTO, Site And Export Cables Bathymetric Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_91eb42db-40ce-4976-be4d-8564f3c8e5fa</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">The London Array Offshore Wind Farm (OWF) is situated approximately 20 kilometres (km) to the northeast of the Kent coast, within the &#x201C;Knock Deep&#x201D; Channel of the Thames Estuary. The OWF consists of 175 Wind Turbine Generators (WTGs) and 2 substations. The export cable route, consisting of four cables, runs for approximately 52km from a landfall site at Seasalter in the Swale to two substations located on the OWF site. Both pre-construction and post-construction bathymetric surveys have been carried out on the OWF site and export cable routes since 2010. EGS International Ltd (EGSi) carried out a post-construction bathymetric survey of the export cable in September 2013, in order to monitor changes in seabed morphology against the 2010 pre-construction survey. In Spring 2014, DONG Energy Wind Power A/S contracted EGSi to carry out a postconstruction bathymetric survey of the export cable route and selected Wind Turbine Generators (WTGs) and connecting array cables.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20220503T15:00:01</dc:date>
</oai_dc:dc>
