<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, EGS, Lincs, LS16 Jack-Up Clearance Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_95c71edb-c096-4a66-95bf-1ecd14149fa5</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2015 post construction hydrographic and geophysical surveys of the Lincs and L &amp; ID (Lynn and Inner Dowsing) windfarm array cable routes. The Lincs and L &amp; ID windfarms are located in the southern North Sea, approximately 5km off the coast of Lincolnshire near Skegness. As an addition to the contracted 2015 survey work, a jack-up clearance survey was carried out in the Lincs wind farm at LS16, using Side-Scan Sonar (SSS) and Multibeam (MBES). Data used for this purpose was acquired on 1st-12th November (west of LS16) and 6th December (east of LS16). This series details the operations and results of the survey around the LS16 turbine.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:47:00</dc:date>
</oai_dc:dc>
