<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2011, LUC, T&amp;SS, Neart na Gaoithe Offshore Wind Farm, Onshore Bat Assessment</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_97ac3568-ae1f-4ad0-8159-ee2e41975974</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Mainstream Renewable Power Limited is currently developing the Neart na Gaoithe Offshore Wind Farm, located 15.5 km off Fife Ness on the east coast of Scotland. An Environmental Statement had to be prepared in support of the application for planning permission to construct and operate grid connection infrastructure associated with the Neart na Gaoithe Offshore Wind Farm located within East Lothian. Land Use Consultants Limited (LUC) with associated sub-consultant Technical and Safety Services (T&amp;SS) were commissioned by Mainstream Renewable Power Limited, on behalf of Neart na Gaoithe Offshore Wind Limited, to undertake a Bat Assessment as part of the Environmental Statement.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">2011</dc:date>
</oai_dc:dc>
