<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, EGS, Lincs, Hydrographic, Geophysical and Benthic Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_98a8bd1f-0727-4dbc-9bc4-f4dec52372fe</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the Lincs and L and ID (Lynn and Inner Dowsing) windfarm array cable routes. Additionally, a benthic survey was required for the Lincs OWF post construction survey. This series details the operations and results of the surveys.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:47:25</dc:date>
</oai_dc:dc>
