  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2014-2015, Fugro Geoconsulting, Beatrice, Geotechnical Completion Campaign</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_9aa5e31a-bede-40c7-9ae2-fe2e81a796e4</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Fugro GeoConsulting Limited was contracted to BOWL to perform the geotechnical completion campaign at
the Beatrice Offshore Wind Farm site. The geotechnical survey was performed to obtain soils information to
assist in the design and installation of wind turbine generators along with the associated meteorological mast
structures, offshore substation platform and export cables.
An advanced geotechnical survey was completed as part of the geotechnical completion campaign. The
advanced geotechnical survey was performed from the geotechnical drilling vessels MV Gargano from
3 October to 24 October 2014 and MV Greatship Manisha from 14 November to 27 November 2014.
The remainder of the geotechnical completion campaign was performed from the geotechnical drilling vessels
the MV Gargano from 25 March to 31 May 2015 and the MV Greatship Manisha from 25 March to 16 May
2015 in accordance with instructions received from BOWL.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20150724</dc:date>