  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2013, Fugro, Beatrice, Interim Geotechnical Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_9aa5e34a-bede-40c7-9ae2-fe2e81a796e4</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Fugro GeoConsulting Limited (Fugro) was contracted to BOWL to perform an interim geotechnical survey at
the Beatrice Offshore Wind Farm site to obtain soils information to assist in the design and installation of wind
turbine generators along with the associated meteorological mast structures, offshore substation platform and
export cables.
The first phase of the work was performed from the geotechnical drilling vessel MV Bucentaur from
5 September to 18 September 2013 and the second phase of the work was performed from the geotechnical
drilling vessel MV Gargano from 27 September to 4 December 2013 in accordance with instructions received
from BOWL.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20140222</dc:date>