<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2005, EMU Ltd., Kentish Flats Offshore Wind Farm, Post-Construction Bathymetric Swath Survey (16/01/2005)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_9c4678bf5b9659c898d7d495259f7598</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction bathymetric surveys of a selection of turbine locations and the associated cable corridor
to determine rates of scour around the turbines after construction. Emu Limited was commissioned by
NEG Micon UK Ltd. to perform a series of hydrographic surveys of these areas in order to determine
whether any scouring occurs around the turbines or significant changes to the seabed profile have been
made during construction of the wind farm. This project relates to the first post-construction swath survey which was carried out on 16th January 2005 from the vessel Avante.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20050301 20050116</dc:date>
</oai_dc:dc>
