<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2013, Osiris Projects, Lincs, Geophysical Survey (Winter)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_a50ce1bd-f2dd-4da7-80dd-3418484d8e2c</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Osiris Projects were commissioned in April 2013 by Centrica Renewable Energy Ltd.
(CREL) and Renewable Energy Systems Ltd. (RES) to carry out post-construction
surveys on the LINCS Offshore Wind Farm (OWF) and associated export cable route.

The survey was completed under LOGIC Terms and Conditions. The survey works
conducted by MV Chartwell were carried out between 4th and 8th May 2013. The
survey works conducted by MV Freja were carried out between 16th and 26th April
2013. Multibeam and side scan sonar were carried out.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:47:29</dc:date>
</oai_dc:dc>
