<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2009-2010, Brown and May Marine Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Year 1 Post-Construction Potting Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_abcd2b92-7136-46fc-af20-477a1f2488f4</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">This report details the findings of the 7th to 12th potting survey undertaken in the area relevant to the operational Lynn &amp; Inner Dowsing offshore wind farms. The survey is the Year 1 post construction survey which span across 2009 and 2010

The survey methodology used replicated that of the previous surveys. This is detailed in the &#x201C;LID Offshore Wind Farm Post-construction Potting Survey, August 2009, Interim Report</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">2010</dc:date>
</oai_dc:dc>
