<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2011-2012, Brown and May Marine Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Year 3 Post-construction Otter and Beam trawl Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_acbcb837-a3d5-473c-9e6a-85db846a7139</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">As part of the environmental monitoring programme outlined within FEPA licences 31792/10/1 and 31814/10/2 for the Lynn and Inner Dowsing (LID) wind farms respectively, both valid from the 10th October 2010 until the 31st October 2013, Brown &amp; May Marine Ltd. was commissioned by Centrica Energy to undertake post-construction fisheries surveys within the LID wind farms.

This report details the findings of the 13th to 16th in a series of otter and beam trawl surveys to be undertaken in the area relevant to the operational LID wind farms. The survey is the Year 3 post construction survey which span across 2011 and 2012.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">2012</dc:date>
</oai_dc:dc>
