  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2010, Fugro Alluvial Offshore Ltd., West of Duddon Sands Offshore Wind Farm, Geotechnical Investigation (Contract Part A - Turbine Positions)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_ace0a541-f6bb-479e-842e-c969a117c737</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Fugro Alluvial Offshore Limited (FAOL) was contracted by Fugro Seacore Ltd on behalf of DONG
Energy Power UK Limited to perform a geotechnical investigation for the proposed West of
Duddon Sands Offshore Windfarm.
The site investigation was performed to provide soils information that would assist in the
geotechnical investigation associated with the survey.
The purpose of this geotechnical site investigation is to provide high quality, fit for purpose,
geotechnical data in a timely and cost-effective manner. The geotechnical investigation shall
provide sufficient and adequate information about soil strata, strength, and deformation
parameters to perform a detailed design of the wind turbine foundations. The foundations may be
Mono piles (MP) or Suction Bucket Foundations (SBF) for the wind turbines, whereas a jacket
pile structure (JPS) is anticipated for the substations.
Phase 1 comprised 163 Piezocone Penetration Tests (PCPT), including extra attempts due to
early refusal, at 118 turbine locations, 1 substation locations, and 21 extra locations.
Phase 2 comprised 96 PCPTs, including extra attempts due to early refusal, at 86 turbine
locations.
The programme of in situ testing was performed in two phases. Phase 1 was performed from
29th May to 25th June 2010. Phase 2 was performed from 29th July to 25th August 2010.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20101201</dc:date>